Knowledge

BESCOM Name Change Charges in Bangalore (2026 Guide)

Dhananjay Mishra
Dhananjay MishraUpdated on: July 22, 2026
BESCOM Name Change Charges in Bangalore (2026 Guide)

BESCOM name change charges Bangalore 2026  transfer fee, stamp paper, security deposit, what the process costs, and what demands to refuse.

Quick Summary (TL; DR)

If you're transferring a BESCOM electricity connection into your name, here are the official charges.

Particular

Amount

LT (Residential) Transfer Fee

₹100

HT (Commercial/Industrial) Transfer Fee

₹500

Power Supply Agreement Stamp Paper

₹500

Indemnity Bond Stamp Paper

₹500

Notarisation (if required)

₹100 to ₹300

Total Official Cost (LT Connection)

₹1,100 to ₹1,600

Important Points

  • The total official cost for a standard residential LT connection is approximately ₹1,100–₹1,600.

  • This includes:

    • ₹100 transfer fee

    • Two ₹500 stamp papers

    • Notarisation (if required)

  • The two stamp papers are required for:

    • Power Supply Agreement

    • Indemnity Bond

  • Both documents are available as fixed-format templates on the BESCOM Energy website.

  • Each document must be printed on a ₹500 Karnataka e-Stamp Paper purchased through SHCIL.

  • HT (High Tension) commercial and industrial connections pay a ₹500 transfer fee instead of ₹100.

  • If the previous owner's name was never updated in BESCOM records, BESCOM may collect a refundable security deposit of around ₹2,500.

  • Any demand above the official charges is not authorised by BESCOM.

  • If asked to pay extra:

    • Ask for a written receipt.

    • Request the fee head.

    • Escalate the matter to the Sub-Divisional Officer.

    • Call the BESCOM Consumer Helpline 1912.

BESCOM Name Change Charges: What You Pay

The official cost for transferring a BESCOM electricity connection into your name is approximately ₹1,100 to ₹1,600 for a normal residential connection.

This amount covers:

  • Transfer fee

  • Two stamp papers

  • Minor notarisation expenses

Nothing more is officially authorised.

Be Careful

Some applicants are asked to pay:

  • ₹2,500 as "processing charges"

  • ₹3,000 as "office charges"

  • ₹5,000 through brokers

These are not official BESCOM charges.

What Is a BESCOM Name Change?

A BESCOM name change (officially called Ownership Transfer) is the process of changing the registered consumer's name on an electricity connection after a property changes ownership.

It updates the electricity records from:

  • Previous owner

  • Builder

to

  • New buyer

After the Transfer

Once the ownership transfer is completed:

  • Electricity bills are issued in your name.

  • The security deposit is linked to your account.

  • You become eligible for schemes such as Gruha Jyothi (subject to eligibility).

What Does NOT Change?

Only the registered consumer name changes.

The following remain the same:

  • Electricity meter

  • Electricity connection

  • RR Number (Revenue Register Number)

The RR Number is BESCOM's unique identification number for every electricity connection.

What is Official BESCOM Name Change Charges (2026)

Government Charges at a Glance

Fee

LT Connection

HT Connection

Transfer Fee

₹100

₹500

Power Supply Agreement

₹500

Indemnity Bond

₹500

Notarisation (if applicable)

₹100 to ₹300

Total

₹1,100 to ₹1,600

Higher depending on HT charges

Need Help with BESCOM Name Change or Gruha Jyothi ? Talk to Vault Proptech about your BESCOM name change.

What is the BESCOM Transfer Fee

The ownership transfer fee depends on your connection type.

Connection Type

Fee

Low Tension (LT)

₹100

High Tension (HT)

₹500

Why Most Homeowners Fall Under LT?

Residential properties such as:

  • Flats

  • Apartments

  • Independent houses

normally fall under LT2A (Domestic Tariff).

You can verify this by checking the Tariff section of your electricity bill.

If your tariff shows LT2A, your transfer fee is ₹100.

Why Do Some People Receive a ₹118 Challan?

  • Some BESCOM offices generate a challan for ₹118 instead of ₹100.

  • This usually includes small processing levies.

  • Both figures are considered within the official range.

Who Pays ₹500?

Commercial properties with higher electrical loads usually fall under HT connections.

Examples include:

  • Large commercial buildings

  • Factories

  • Industrial units

These consumers pay ₹500 as the ownership transfer fee.

Notarisation Costs

Some BESCOM sub-division offices ask for notarised copies of the sale deed, Khata certificate, and property tax receipt. Notarisation is done at a Notary Public, usually available within walking distance of any SRO or BESCOM office.

Notarisation costs approximately ₹10 to ₹20 per page. For a sale deed of 5–8 pages, Khata certificate, and tax receipt, the total notarisation cost typically runs between ₹100 and ₹300.

Notarisation of the Power Supply Agreement and Indemnity Bond is generally not required; these are new documents executed in your name.

Need Help with BESCOM Name Change or Gruha Jyothi ? Talk to Vault Proptech about your BESCOM name change.

Security Deposit Situation

If the previous owner never changed the BESCOM connection into their name after their own purchase, BESCOM may ask for a fresh security deposit of approximately ₹2,500.

This happens in two specific situations: when you are the first buyer in a property chain where the original connection has always been in the builder's name, or when the property has changed hands multiple times, and the BESCOM records were never updated.

If the Khata transfer from the builder to the first buyer was never done, and you are now the second buyer, BESCOM treats this as a fresh connection registration rather than a name transfer, and the fresh security deposit applies.

The security deposit is not a fee  it is a refundable amount held by BESCOM against your account and returned when you eventually surrender the connection. It is not lost money, but it is an upfront cost you need to plan for.

Total Cost Summary

For a standard residential LT connection in a flat where the previous Khata chain is complete, and the seller's name was properly in BESCOM records:

  • Transfer fee: ₹100.

  • Power Supply Agreement stamp paper: ₹500.

  • Indemnity Bond stamp paper: ₹500.

  • Notarisation (if required): ₹150 to ₹300 approximately.

  • The total lands between ₹1,100 and ₹1,600.

If the previous owner's name was also never updated, and BESCOM demands a fresh security deposit, add ₹2,500. This brings the total to approximately ₹3,600 to ₹4,100, but again, the security deposit is fully refundable.

What BESCOM Staff Cannot Charge?

This is where the reality diverges from what is sometimes demanded.

BESCOM office staff have reportedly demanded ₹3,000 for a single transfer and offered discounted rates of ₹2,800 per connection for bulk transfers involving an entire apartment building of 100 connections. Despite this, a volunteer completed the process independently within about two weeks, demonstrating that it is entirely possible to navigate the system without paying bribes.

  • There is no authorised "processing charge" of ₹2,000 or ₹3,000. There is no authorised "speed fee" for faster processing.

  • There is no authorised payment for the AEE or JE's site visit. The transfer fee is ₹100. The stamp papers are ₹500 each. That is it.

If anyone at the BESCOM office demands additional payment, ask for a written receipt against the specific fee head. An unauthorised demand will never come with a receipt. If the officer refuses to process your application without the extra payment, escalate to the Sub-Divisional Officer and file a complaint at the BESCOM consumer helpline: 1912.

What are the April 2026 Digital Integration Changes?

In April 2026, BESCOM integrated with GBA's e-Khata platform. For properties with a Final e-Khata in the new owner's name, the name transfer process can now be initiated online at BESCOM energy without a physical visit for the initial application.

The integration auto-fills your property details from the e-Khata database: owner name, property address, and consumer ID, reducing paperwork. The Power Supply Agreement and Indemnity Bond can be uploaded digitally. Payment of the ₹100 transfer fee can be done online via UPI.

However, a Junior Engineer site visit for meter verification is still required for most applications, so the process is not entirely contactless. The digital route is faster for properties with clean e-Khata records. If your e-Khata is still a draft or pending, the offline route at the sub-division office remains necessary.

Need Help with BESCOM Name Change or Gruha Jyothi ? Talk to Vault Proptech about your BESCOM name change.

What are the Documents Required for BESCOM Name Change?(What Each Costs)

The documents themselves cost nothing to obtain; most are already with you. The only costs are for stamp papers and notarisation.

  • You need the NOC from the previous owner (if the seller writes it).

  • The registered sale deed you already have from registration. T

  • he Khata certificate in your name obtained from eaasthi.karnataka.gov.in after Khata transfer.

  • The latest property tax receipt from bbmptax.karnataka.gov.in.

  • The latest electricity bill from the previous owner, the seller, provides this.

  • A photograph of the meter taken within 2 to 3 days of your application.

  • Your Aadhaar card copy.

  • One passport photograph.

  • Form 13  downloaded free from BESCOM Energy.

The only costs in this list are the ₹500 stamp papers (for Power Supply Agreement and Indemnity Bond) and notarisation charges on the sale deed and Khata, if the specific sub-division office requests notarised copies.

BESCOM Name Change: Vault Proptech Helps

If the seller is unavailable to give the NOC, if the Khata chain has gaps, or if the sub-division office is asking for more than the authorised charges, Vault Proptech coordinates the complete BESCOM name change for new property buyers in Bengaluru.

Vault Proptech handles NOC drafting and coordination, Form 13 and stamp paper preparation, sub-division office submission, and Junior Engineer follow-up, and escalation when the process stalls or unauthorised demands are made.

Need Help with BESCOM Name Change or Gruha Jyothi ? Talk to Vault Proptech about your BESCOM name change.

Frequently Asked Questions

The official charges for a residential LT connection name change are: ₹100 transfer fee, ₹500 for the Power Supply Agreement stamp paper, and ₹500 for the Indemnity Bond stamp paper. Total official cost: ₹1,100, plus ₹100–₹300 for notarisation if required. Any demand above this from BESCOM staff is not authorised.

LT (Low Tension) connections cover all standard residential properties, flats, houses, and small shops. The transfer fee is ₹100. HT (High Tension) connections cover large commercial and industrial properties with high load requirements. The transfer fee is ₹500. Check your electricity bill's "Tariff" section to confirm your category.

Yes. Purchase ₹500 e-stamp papers from shcilestamp.com. Download and print the Power Supply Agreement and Indemnity Bond templates from BESCOM Energy. Print each agreement on one e-stamp paper and sign before witnesses.

BESCOM treats this as a fresh registration rather than a transfer, and may require a fresh security deposit of approximately ₹2,500. This is refundable when you eventually surrender the connection. To avoid this, ensure you do a Khata transfer before approaching BESCOM Khata in your name, which establishes a clean property ownership chain that BESCOM recognises.

The process typically takes 15 to 30 days from the date of document submission and fee payment. A Junior Engineer verifies the meter and documents within 7 to 15 days of submission. Once approved, the name reflects in the next billing cycle.

Yes. If BESCOM requires a fresh security deposit because the ownership chain was never updated in its records, the amount is treated as a refundable deposit and not a processing fee. The deposit remains linked to your consumer account and is refundable when the electricity connection is permanently surrendered, subject to adjustment against any outstanding dues.

Yes. The BESCOM name change process can be completed without an agent or broker. The required forms, agreement templates, and fee structure are publicly available. Most applicants can complete the process themselves by submitting the required documents, paying the official charges, and cooperating with the Junior Engineer's verification visit.

Yes. Outstanding electricity dues generally need to be cleared before BESCOM processes a name change request. Before purchasing a property, ask the seller for the latest paid electricity bill and verify that there are no pending charges linked to the RR Number.

Yes. Once the sale deed is registered and the ownership documents are available, you can begin the BESCOM name transfer process. However, many subdivision offices prefer that the Khata transfer be completed first because the Khata certificate serves as proof of ownership during verification.

No. A BESCOM name transfer only updates the consumer details attached to the existing connection. The meter, RR Number, tariff category, and electricity supply remain unchanged throughout the process. As long as bills are paid on time, the transfer process does not interrupt power supply.

Other Blogs